diff --git a/guides-data.js b/guides-data.js index 836e150..b124788 100644 --- a/guides-data.js +++ b/guides-data.js @@ -13,7 +13,7 @@ window.GUIDES = [ faq: [ ["Can uncompressed 2160p59.94 run over 10GbE?", "No. The ST 2110-20 active payload for 2160p59.94 10-bit 4:2:2 is about 9.94 Gb/s before RTP/UDP/IP/Ethernet overhead, so it exceeds a 10GbE link. Use 25GbE or faster for UHD endpoints, or compress with ST 2110-22 (JPEG XS)."], ["Do we need Red/Blue (ST 2022-7) redundancy?", "For live and on-air paths, yes: two physically separate fabrics with no shared chassis or inter-switch links, and endpoints that send and receive both streams. Non-critical edit or monitoring paths can run single-network to save cost."], - ["Boundary clock or transparent clock?", "We default to boundary clocks in spine-leaf media fabrics because they terminate PTP at each hop and keep switch queuing out of the timing path. Whatever you choose, validate it with a PTP analyzer on the finished network and follow your switch and endpoint vendors' tested profiles."], + ["Boundary clock or transparent clock?", "Both handle switch queuing: a transparent clock corrects for residence time in the correctionField. We default to boundary clocks in spine-leaf media fabrics because they scale: each switch serves Delay_Req traffic for its own ports instead of every endpoint talking to the grandmaster, and each hop isolates its downstream timing domain. Whatever you choose, validate it with a PTP analyzer on the finished network and follow your switch and endpoint vendors' tested profiles."], ["Multicast/IGMP or SDN orchestration?", "Small fabrics can run IGMPv3 and PIM with careful design. Larger or tightly packed fabrics benefit from SDN or broadcast-controller bandwidth reservation, because multicast alone does not know whether a chosen path has headroom."], ["Do we have to rip out SDI on day one?", "No. Most migrations are phased: IP core and gateways first, then IP edge devices, then native IP studio floors. SDI islands remain connected through gateways until their end-of-life."] ], @@ -36,11 +36,11 @@ window.GUIDES = [

When migration makes sense

SDI is simple and deterministic: a 3G-SDI link carries 2.97 Gb/s of multiplexed video, embedded audio, and ancillary data, and a router switches it on the vertical interval. The limits show up at scale. 12G-SDI for UHD needs premium coax with short runs, every format change means new cable, and pulling a single audio channel out of a multiplex needs de-embedders.

-

SMPTE ST 2110 splits each signal into separate essence streams over RTP: ST 2110-20 uncompressed video, -30 PCM audio (AES67-compatible), -31 AES3 transparent audio, -40 ancillary data, and -22 compressed video. The Ethernet fabric becomes the router. That buys format-agnostic cabling, flexible audio, and room to grow, but it moves the engineering burden to timing, bandwidth, multicast, and control. If you only need a few more SDI inputs, a hybrid router may be the better answer; IP pays off when you are building new rooms, need UHD, or want to share a plant across rooms and sites.

+

SMPTE ST 2110 splits each signal into separate essence streams over RTP. ST 2110-10 is the system layer underneath all of them: PTP-derived RTP timestamps, SDP signaling, and the standard UDP datagram size (1460 bytes or less; extended jumbo payloads are optional and must be supported end to end, so standard MTU is the safe default). The essence standards are ST 2110-20 uncompressed video, -30 PCM audio (AES67-compatible), -31 AES3 transparent audio, -40 ancillary data, and -22 compressed video. The Ethernet fabric becomes the router. That buys format-agnostic cabling, flexible audio, and room to grow, but it moves the engineering burden to timing, bandwidth, multicast, and control. If you only need a few more SDI inputs, a hybrid router may be the better answer; IP pays off when you are building new rooms, need UHD, or want to share a plant across rooms and sites.

Fabric topology: spine-leaf vs. monolithic core

Monolithic core. One large modular switch, every endpoint home-run to it. It is simple to reason about and has no inter-switch links to oversubscribe, but it demands long fiber runs, is expensive to expand, and concentrates failure in one chassis (which Red/Blue then has to duplicate).

-

Spine-leaf. Leaf switches sit near the endpoints (studio, control room, rack rooms) and uplink to two or more spines. It scales by adding leaves, shortens cable runs, and keeps failure domains small. The price is that uplinks must be sized deliberately: for uncompressed flows we design leaf-to-spine capacity to be non-blocking, not the 3:1 or 5:1 oversubscription typical of enterprise networks. As an example, thirty 1080p59.94 senders on one leaf is roughly 78 Gb/s of video, so a single 100G uplink is already tight once you add audio, ancillary data, and headroom.

+

Spine-leaf. Leaf switches sit near the endpoints (studio, control room, rack rooms) and uplink to two or more spines. It scales by adding leaves, shortens cable runs, and keeps failure domains small. The price is that uplinks must be sized deliberately: for uncompressed flows we design leaf-to-spine capacity to be non-blocking, not the 3:1 or 5:1 oversubscription typical of enterprise networks. As an example, thirty 1080p59.94 senders on one leaf is roughly 78 Gb/s of video, so 2×100G uplinks carry it comfortably, but lose one spine and the surviving 100G link is already tight once you add audio, ancillary data, and headroom. Size for the failure case, not the happy path, and favor switches with buffer depth suited to multicast media rather than enterprise defaults.

Whichever you choose, check the switch's multicast replication and buffer behavior, not just port speed. Packet bursts from many senders converging on one egress port are what exhaust shallow buffers.

Multicast, IGMP, and SDN orchestration

@@ -64,7 +64,7 @@ window.GUIDES = [

PTP timing: IEEE 1588 and SMPTE ST 2059

IP facilities distribute time over the same Ethernet using the Precision Time Protocol (IEEE 1588), profiled for media by SMPTE ST 2059-2. SMPTE ST 2059-1 defines how video frame and audio sample alignment is derived from the PTP timescale, whose epoch is 1970-01-01 00:00:00 TAI. Every sender timestamps its RTP packets against that clock, which is what lets receivers align sources from different cameras and rooms without genlock cabling.

diff --git a/guides/smpte-2110-facility-migration/index.html b/guides/smpte-2110-facility-migration/index.html index cfa3f2a..9f73ed3 100644 --- a/guides/smpte-2110-facility-migration/index.html +++ b/guides/smpte-2110-facility-migration/index.html @@ -38,7 +38,7 @@ ul.sp-list{padding-left:1.25rem;color:var(--color-muted);line-height:1.8} .sp-related small{display:block;color:var(--color-muted);margin-top:.35rem} @media(max-width:640px){.sp-nav nav{gap:1rem}.sp-nav nav a:nth-child(3){display:none}} - +
@@ -68,11 +68,11 @@ ul.sp-list{padding-left:1.25rem;color:var(--color-muted);line-height:1.8}

When migration makes sense

SDI is simple and deterministic: a 3G-SDI link carries 2.97 Gb/s of multiplexed video, embedded audio, and ancillary data, and a router switches it on the vertical interval. The limits show up at scale. 12G-SDI for UHD needs premium coax with short runs, every format change means new cable, and pulling a single audio channel out of a multiplex needs de-embedders.

-

SMPTE ST 2110 splits each signal into separate essence streams over RTP: ST 2110-20 uncompressed video, -30 PCM audio (AES67-compatible), -31 AES3 transparent audio, -40 ancillary data, and -22 compressed video. The Ethernet fabric becomes the router. That buys format-agnostic cabling, flexible audio, and room to grow, but it moves the engineering burden to timing, bandwidth, multicast, and control. If you only need a few more SDI inputs, a hybrid router may be the better answer; IP pays off when you are building new rooms, need UHD, or want to share a plant across rooms and sites.

+

SMPTE ST 2110 splits each signal into separate essence streams over RTP. ST 2110-10 is the system layer underneath all of them: PTP-derived RTP timestamps, SDP signaling, and the standard UDP datagram size (1460 bytes or less; extended jumbo payloads are optional and must be supported end to end, so standard MTU is the safe default). The essence standards are ST 2110-20 uncompressed video, -30 PCM audio (AES67-compatible), -31 AES3 transparent audio, -40 ancillary data, and -22 compressed video. The Ethernet fabric becomes the router. That buys format-agnostic cabling, flexible audio, and room to grow, but it moves the engineering burden to timing, bandwidth, multicast, and control. If you only need a few more SDI inputs, a hybrid router may be the better answer; IP pays off when you are building new rooms, need UHD, or want to share a plant across rooms and sites.

Fabric topology: spine-leaf vs. monolithic core

Monolithic core. One large modular switch, every endpoint home-run to it. It is simple to reason about and has no inter-switch links to oversubscribe, but it demands long fiber runs, is expensive to expand, and concentrates failure in one chassis (which Red/Blue then has to duplicate).

-

Spine-leaf. Leaf switches sit near the endpoints (studio, control room, rack rooms) and uplink to two or more spines. It scales by adding leaves, shortens cable runs, and keeps failure domains small. The price is that uplinks must be sized deliberately: for uncompressed flows we design leaf-to-spine capacity to be non-blocking, not the 3:1 or 5:1 oversubscription typical of enterprise networks. As an example, thirty 1080p59.94 senders on one leaf is roughly 78 Gb/s of video, so a single 100G uplink is already tight once you add audio, ancillary data, and headroom.

+

Spine-leaf. Leaf switches sit near the endpoints (studio, control room, rack rooms) and uplink to two or more spines. It scales by adding leaves, shortens cable runs, and keeps failure domains small. The price is that uplinks must be sized deliberately: for uncompressed flows we design leaf-to-spine capacity to be non-blocking, not the 3:1 or 5:1 oversubscription typical of enterprise networks. As an example, thirty 1080p59.94 senders on one leaf is roughly 78 Gb/s of video, so 2×100G uplinks carry it comfortably, but lose one spine and the surviving 100G link is already tight once you add audio, ancillary data, and headroom. Size for the failure case, not the happy path, and favor switches with buffer depth suited to multicast media rather than enterprise defaults.

Whichever you choose, check the switch's multicast replication and buffer behavior, not just port speed. Packet bursts from many senders converging on one egress port are what exhaust shallow buffers.

Multicast, IGMP, and SDN orchestration

@@ -96,7 +96,7 @@ ul.sp-list{padding-left:1.25rem;color:var(--color-muted);line-height:1.8}

PTP timing: IEEE 1588 and SMPTE ST 2059

IP facilities distribute time over the same Ethernet using the Precision Time Protocol (IEEE 1588), profiled for media by SMPTE ST 2059-2. SMPTE ST 2059-1 defines how video frame and audio sample alignment is derived from the PTP timescale, whose epoch is 1970-01-01 00:00:00 TAI. Every sender timestamps its RTP packets against that clock, which is what lets receivers align sources from different cameras and rooms without genlock cabling.

Frequently asked questions

-
Can uncompressed 2160p59.94 run over 10GbE?
No. The ST 2110-20 active payload for 2160p59.94 10-bit 4:2:2 is about 9.94 Gb/s before RTP/UDP/IP/Ethernet overhead, so it exceeds a 10GbE link. Use 25GbE or faster for UHD endpoints, or compress with ST 2110-22 (JPEG XS).
Do we need Red/Blue (ST 2022-7) redundancy?
For live and on-air paths, yes: two physically separate fabrics with no shared chassis or inter-switch links, and endpoints that send and receive both streams. Non-critical edit or monitoring paths can run single-network to save cost.
Boundary clock or transparent clock?
We default to boundary clocks in spine-leaf media fabrics because they terminate PTP at each hop and keep switch queuing out of the timing path. Whatever you choose, validate it with a PTP analyzer on the finished network and follow your switch and endpoint vendors' tested profiles.
Multicast/IGMP or SDN orchestration?
Small fabrics can run IGMPv3 and PIM with careful design. Larger or tightly packed fabrics benefit from SDN or broadcast-controller bandwidth reservation, because multicast alone does not know whether a chosen path has headroom.
Do we have to rip out SDI on day one?
No. Most migrations are phased: IP core and gateways first, then IP edge devices, then native IP studio floors. SDI islands remain connected through gateways until their end-of-life.
+
Can uncompressed 2160p59.94 run over 10GbE?
No. The ST 2110-20 active payload for 2160p59.94 10-bit 4:2:2 is about 9.94 Gb/s before RTP/UDP/IP/Ethernet overhead, so it exceeds a 10GbE link. Use 25GbE or faster for UHD endpoints, or compress with ST 2110-22 (JPEG XS).
Do we need Red/Blue (ST 2022-7) redundancy?
For live and on-air paths, yes: two physically separate fabrics with no shared chassis or inter-switch links, and endpoints that send and receive both streams. Non-critical edit or monitoring paths can run single-network to save cost.
Boundary clock or transparent clock?
Both handle switch queuing: a transparent clock corrects for residence time in the correctionField. We default to boundary clocks in spine-leaf media fabrics because they scale: each switch serves Delay_Req traffic for its own ports instead of every endpoint talking to the grandmaster, and each hop isolates its downstream timing domain. Whatever you choose, validate it with a PTP analyzer on the finished network and follow your switch and endpoint vendors' tested profiles.
Multicast/IGMP or SDN orchestration?
Small fabrics can run IGMPv3 and PIM with careful design. Larger or tightly packed fabrics benefit from SDN or broadcast-controller bandwidth reservation, because multicast alone does not know whether a chosen path has headroom.
Do we have to rip out SDI on day one?
No. Most migrations are phased: IP core and gateways first, then IP edge devices, then native IP studio floors. SDI islands remain connected through gateways until their end-of-life.

Planning an SDI-to-IP migration?

We design, phase, and commission ST 2110 and hybrid facilities in the DC, Maryland, and Northern Virginia area and nationally. See broadcast systems integration and broadcast integration in the DMV.

Request a consultation