Detailed 22-task plan for the foundation wave (build pipeline + theme port + every CSS primitive, no page migration yet). Smoke-test page at _primitives-smoke.html is the wave-1 QA gate. Waves 2-4 will get their own plan documents after each prior wave ships. |
||
|---|---|---|
| .. | ||
| 2026-05-18-nle-editor.md | ||
| 2026-05-21-cluster-codec-revamp.md | ||
| 2026-05-21-ui-shell-rework-wave-1-plan.md | ||